
- This event has passed.
IHP Expansion – Matt, Tanner
April 5, 2021 @ 7:00 am - 3:30 pm
Contract
Underground
Make sure all pipes have been repaired. Vac strings to insure integrity. Make as built of all underground on drawings to confirm we have everything we need. Pouring this week Wednesday or Thursday.
Time and Materials
Pumpkin Processing Bldg. (need as builts)
(after shop)