
- This event has passed.
Burton T Pole OH SECO – Ben
April 12, 2021 @ 10:00 am - 12:00 pm
Contract
Must be set within 5′ of permanent service. Steven should have it staked. We set an overhead T Pole as an underground. No bracing required. Make sure there are no missing KO seals or breaker blanks. WR devices, all receptacles must be GFI protected or disconnected and made safe.
(after HBH Lot 444)