
- This event has passed.
Dave Benzel – Justin H.
August 23, 2021 @ 10:00 am - 12:00 pm
Contract
Run new conduit and wire to well. 3/4″ conduit with circuit for pump and softner
tie in 120v to shop circuit
tie in 240v to pump house.
I’ll be there after I trench Nolette in with the machine.
10:00am (after Jackson)