
- This event has passed.
Saidizand Trim – Ryan, Austin, Tanner, Josh M.
September 12, 2021 @ 7:00 am - 3:30 pm
Contract
Materials in shop check by outgoing job shelf and pallet
***Priority***Connect irrigation pump (post and pullout disconnect on job site)
Connect generator after moving it 5′ from window, not in front of A/C disconnect, 2′ from A/C compressor. Can turn perpendicular to house if necessary.
Finish Trim
7:00am