Lake Const. – Vick – Ryan, Luke

MEET AT SHOP AT 6:30AM

Time and Materials

Materials in shop

Add 8 can lights to front living room.

Replace existing ceiling fixtures in front living room.

Replace hanging light fixture in master bedroom

Add 2 can lights in master bedroom

Add receptacle for bidet in master bath (look at spec on this, may need to be dedicated GFI)

Change ceiling fixture and add 4 cans (4″) in master entry.

Add 4 recess cans in family room

Replace flush mount in family room with LED trims

Add 4 recess cans to each of the 3 bedrooms

Replace existing can fixtures (x2) in hallway

Add 1 can in bath 3

Add 4 recess cans in entry to family room.

Change existing hanging light fixture in game room.

7:00am Job Site