Loading Events

Hauff – Saidizand Trim – Ryan, Brandon

Contract

Finish trim for final. Final inspection Monday

Josh M. texted that we needed;

20 amp receptacle

brass floor box cover

(should have this in the shop or can pick up at City)

8:00am

Posted in

Rick Batchelor