Lake Const. – Majors Trim – Vilmos, Ryan, Mason
February 3, 2022 @ 7:00 am - 3:30 pm
Ryan and Mason take 16’ ladder out and pick up when complete, set up for Vilmos
Contract
7:00am
×1- Front porch fixture (16′ ladder)
x6- flood wp blank
X1- box blank or vanity back bath
×2- box blank Or hang vanity master bath
×2- rear lanai bell box, wp. blank hood stub out
x1- install 6×6 PVC box on pipes and over
romex stub outs (2- 3/4 conduit, 1- 1″ conduit)
X1 wp blank or install recep above fireplace
lanai(stone is fucked up)
×3 wp blank fans on rear lanai (holes cut out
completely improperly on all cans and fans)
×2 Instahots need need cord installed and
………………
-Multiple fixtures to hang inside
-Disposal hookup (1- 3′ appliance cord, 1- 1/2″
romex connector)
2-instahot hookups w/ thermostats (3′
appliance cord) (thermostats on site)
-receptacle plates on island
-drywall damage around pop in boxes on
peninsula, maybe screw a furring strip to
backside of drywall for pop in box to be able to
lock in