
- This event has passed.
Lake Const. – Nathan Trim – Logan, Paul
November 22, 2022 @ 7:00 am - 5:30 pm
Contract
Pull what materials you can from the shop have the shop order the rest.
•Move exhaust fan wire to 2 gang and put
vanity and shower can on same switch in
2nd floor bath
•install cut in boxes for smokes and install
smokes in stair wells
•splice chime wires and blank it off
•cut in upper cabinet outlet
•take out can trims that aren’t vapor locked
and install 6in can trims that are (4)
•find soffit outlet wires and install outlet
and bubble cover
•install island pendant on second
floor(when he brings it)
•install remaining coach lights (when he
cuts them)
• hook up hot water heater down stairs
7:00am