Contract
materials to do the permanent well connection should be on site
plumber is scheduled to be there and should dig a portion of the trench for his water line, continue the trench for our electrical connection
7:00am
Posted in

Contract
materials to do the permanent well connection should be on site
plumber is scheduled to be there and should dig a portion of the trench for his water line, continue the trench for our electrical connection
7:00am