
- This event has passed.
Weber – Fulmer Extra – Justin, Gerard
March 1, 2023 @ 7:00 am - 8:00 am
Time and Materials
Move FP recep up 2’
If stone guy is there;
Need to install cutin in stone cut out area with long screws add a depth ring and plate, then stone guy will install escutcheon and can reinstall recep.
Jared is saying stone guy isn’t there do it anyway;
Ascertain location based off visual inspection, pop stone off with a screwdriver in the determined location from visual inspection, cut out durock, do electrical work. Remove old outlet and rg6 location so stone guy can come back and patch it.
7:00am