Contract
Materials in shop
Rigid conduit on front apron by gate for OH riser
Building adjacent to existing service. Plan materials needed to tie in after green tag and energized. 3 phase loads fed from outside. 1 phase loads will remain and be fed from 3 phase feed thru lugs.
7:00am
Posted in