
Time and materials
Change air handler breaker to a two pole 30 amp
Add smoke detector in the high ceiling near the peak not required by code required by AHJ stupid ass inspector
2:00pm
Posted in

Time and materials
Change air handler breaker to a two pole 30 amp
Add smoke detector in the high ceiling near the peak not required by code required by AHJ stupid ass inspector
2:00pm