Loading Events

Vogel – Lot 312 Column Power – Justin, Gerard

Contract
Get inground junction boxes from behind shop on pallet you need 2
Materials is being delivered to site by City first thing
Run conduit to front columns
Underground locates completed, a lot of gas line flags, must hand dig a portion at road and drive way crossing.
Cross 4 feet behind the steaks favoring the house
7:00am

I will be out with trencher right as soon as they open the gate because I have to be at a meeting at 8:00am

Posted in

Rick Batchelor