Loading Events

Vogel – Lot 312 Trim – Ben, Paul

Contract
312 power is on, all A/C, A/H, and sump pump from both houses are wired and ready to go.

312- Facing into garage, the left two fluorescent lights need adjustment. Hanging slightly down from ceiling.

312- Waiting on heights for kitchen pendants, dining chandelier, entry chandelier, and master sitting chandelier.
Waiting on kitchen cabinets and summer kitchen cabinets.

312- The office floor box was missed by tile guys. They put hole in wrong spot and covered the floor box.

312 – Need hot check.
(After LBP)

Posted in

Rick Batchelor