Loading Events

« All Events

  • This event has passed.

Jennings Lot 72 Trim – Dustin, Paul, Brandon

June 22, 2020 @ 7:00 am - 3:30 pm

Contract

Get Brandon started before going over to Lester Austin please….

Panel needs to be labeled, exterior outlets needed between A/C and pool equipment, Label Air Handler on second floor, A/C 3 needs to be 25 amp breaker, All plates need to be installed, Install LED tape lighting and power supplies, double check and make sure nothing else is not done i.e. tankless water heater you mentioned

(After Shop)

Dustin and Paul to be back after Lester Austin

 

Details

Date:
June 22, 2020
Time:
7:00 am - 3:30 pm

Venue

FL United States + Google Map

Leave a Comment

You must be logged in to post a comment.