
- This event has passed.
Arturo Aleman- Ben
March 17 @ 9:00 am - 11:00 am
Service 145hr/materials
Minimum 20a/120v circuit to septic panel (septic contractor would prefer 30a/120v)
Owner/builder installed recep next to septic panel, unknown if dedicated.
Charlie with Rob’s Septic left paperwork inside panel for hookup
904-655-9668