Hauff – Aronoff Trim – Dustin

June 3 @ 7:00 am - 9:00 am

Contract
Materials in shop
Per failed inspection;
Relieve stucco 1/4″ space along bottom of meter main (Garett spoke to Larry and he will accept bottom being cleared on stucco to allow water shed)
Install intersystem bonding block (per photo I have its there, just needs to be cleared to get cover off and make it accessible)
Phase 240v white conductors red
Silicone exterior light fixtures
Box and blank for hood wire
Confirm wire in exterior conduits is thhn/thwn rated (photo of insulation type needed) if not thwn rated we’ll have to change it.
7:00am

Meeting scheduled in Ocoee for 9:00am, can’t be late. If not complete will have to come back to Aronoff to finish