Loading Events

Avalon Shell Bldg – Matt

“House” panel tag, “House” meter tag being made first thing. Time clock and fixture coming UPS to CES between 10-11. Josh will bring tags and materials from CES as soon as it arrives to the Apopka job if the inspector agrees to come in the afternoon.

Contract

Install remaining fixture and timeclock

Final inspection

Install house tags

Posted in

Joshua Chase