Contract
Materials in shop on pallet
Josh has an idea of what needs to be done. (I’ll try and do a sketch for you.)
Start with digging from the meter main back towards the rear fence in the center. There are irrigation lines along side the house that cross at the gate area then follow the fence down the left side.
Josh starts at 8:00am we may be able to work it out where we can get the walk behind there, there is an issue with the hitch height.
Mount vinyl post center of rear fence line, receptacle mounts on post then feed out to conduit stubbed out of the slab in the center behind where the fountain is going.
Then we are going to mount a large PVC j box on angle brackets behind the fountain down low and mount another receptacle off to one side inside of it. Saving room for a transformer for the fountain.
Pull two circuits back to the vinyl post at the rear fence but leave the one circuit capped off for future.
7:00am