
Contract
Dustin, take Chris N., and Derrek over get them set up make sure they have trenching shovels and a saws all with a big wood blade.
I got about 100′ already dug with the trencher and conduit installed, I left the rest of the conduit there, they will need a couple 3/4″ 90s, couplings and the wire to pull in.
7:00am
Posted in