Loading Events

Capsanes Lintel – Billy, Derrek

Contract

Get book and print from shop.

Make sure you have metal deep old work boxes with 3/4″ KOs, 3/4″ PVC schedule 40, figure 10′ per box to be safe. 3/4″ PVC MAs, LNs, tie wire, cut nails, ground screws, ground wire, 6/32 x 1″ machine screws, duct tape

Make sure you do all the garage block wall stuff inside and out, any columns that we can’t access from a drywall finished interior.

(after T Pole)

Posted in

Rick Batchelor