Loading Events

Adams – Roman Trim – Logan, Paul

Contract

materials to do the permanent well connection should be on site

plumber is scheduled to be there and should dig a portion of the trench for his water line, continue the trench for our electrical connection
7:00am

Posted in

Rick Batchelor