Loading Events

« All Events

  • This event has passed.

Arturo Aleman- Ben

March 17 @ 9:00 am - 11:00 am

Service 145hr/materials

Minimum 20a/120v circuit to septic panel (septic contractor would prefer 30a/120v)
Owner/builder installed recep next to septic panel, unknown if dedicated.
Charlie with Rob’s Septic left paperwork inside panel for hookup

904-655-9668

Details

  • Date: March 17
  • Time:
    9:00 am - 11:00 am

Venue

Leave a Comment

You must be logged in to post a comment.