Bella Collina – Justin, Codey, John, Alex, Derrek

John have Derrek take you and the van out to the job so you have a van to work out of, Codey follow and take Derrek back to 96 Rough

Contract

HBH Lot 281 – need to get those breakers in and a breaker lock for the water heater Monday morning before inspection – Justin

HBH Lot 283 Prepower – Keith wants to get the back lit counter top done Monday. He wants to run an extension cord to the transformer to hot check it before counter gets put on – Justin, Alex

Other Jobs

Jennings Lot 94 Rough –

Jennings Lot 96 Rough – John, Codey, Derrek

Time and Materials

Luxury Home and Pools – Lot 281 Pool – John (if you need help pulling wire, Justin and Alex are near you at 283)

Lot 283 Pool – after Bayer