Burton Slab – Billy, Tanner
May 4, 2021 @ 9:00 am - 10:00 am
Contract
Reinstall conduit that got removed (possibly to floor box) it was in the footer
Panel conduits are out 8″ move both toward back of house inside of form board.
Cut plastic as needed, must be taped back with the special tape on the pallet out on the job site.
Remove all materials from site.
7:00am