
- This event has passed.
Code Ninja’s – Tim
March 12, 2020 @ 7:00 am - 3:30 pm
Contract
***Materials in shop***(Floor Boxes)
You’ll need PVC conduit 3/4″, fittings, 90s, book and print. (pull what you can from shop, pick up the rest from City)
Lock Code 712
Floor is cut, install floor boxes, follow layout on print, conduit to frame wall not fire wall as drawn. Make sure they are set 1/4″ above concrete to be flush with finish floor.
7:00am