Loading Events

« All Events

  • This event has passed.

Code Ninja’s – Tim

March 12, 2020 @ 7:00 am - 3:30 pm

Contract

***Materials in shop***(Floor Boxes)

You’ll need PVC conduit 3/4″, fittings, 90s, book and print. (pull what you can from shop, pick up the rest from City)

Lock Code 712

Floor is cut, install floor boxes, follow layout on print, conduit to frame wall not fire wall as drawn. Make sure they are set 1/4″ above concrete to be flush with finish floor.

7:00am

Details

  • Date: March 12, 2020
  • Time:
    7:00 am - 3:30 pm

Venue

Leave a Comment

You must be logged in to post a comment.