
- This event has passed.
David Elieff – Justin H., Tanner
August 31, 2021 @ 7:00 am - 3:30 pm
Contract
Materials in shop (some of this is the conduit layin on the ground with tape still on it)
Add new 60 amp sub panel at meter main service, relocate 30 amp pool breaker to new sub panel. New 20 amp 250v circuit to irrigation pump at lake.
Approximately 90′ hand trench (bidded), 200′ total distance we will have to hand dig it. Only 18′ burial depth required. Big machine still down and nothing tall enough to move the walk behind without my truck there. Trying to get the trailer hitch welded differently where we can move with a van.
Gate #4589
407.443.3260
7-8:00am