Derelle – Hugh Rough – Justin H., Tanner
Contract
See punch list below
(complete after Wall rough if time permits)
Cut in panel
No phone line and ethernet ran, only on RG6?
Island circuits need to be pulled in and tied in and pipe cut down and converted to flex for island cabinet to be set. Leave long whip.
Island junction box bundled romex in one PVC connector, need individual pinch grommets for each wire or two wires max per pinch grommet.
Pull can stub out down and stub out of ceiling (below drywall) in a rigid way to make sure they end up properly aligned for trims to be cut in later.
3 gang switch box in laundry too close to exterior man door.
SER ran through pipe from service to interior panel.
Front porch receptacle cut out for 1 gang bracket box and mount box.
Kitchen UCL (missing?)
Chip out stucco to mount pancakes for coach lights
Some switches have bundled wires coming down, 3 or more wires must be in stand offs.
3 gang in master bath (confirm how mounted and secured)
Multi gang switches cut in with one long ground wire (use insulated ground wire)
Reroute AHU pipe to bring closer to where the unit will be installed
Circuit stub out for J box for summer kitchen needs to be trenched and brought up at future BBQ/Trash area.