
Time and Materials
Hand dig with caution, gas line buried in the area.
20a/125v dedicated circuit fed from service.
(after shop)
Posted in

Time and Materials
Hand dig with caution, gas line buried in the area.
20a/125v dedicated circuit fed from service.
(after shop)