
- This event has passed.
Donna Ryder – Brandon
June 21, 2021 @ 7:00 am - 1:00 pm
Main house furthest back on the property
Contract
Materials in shop
SECO scheduled to disconnect 9-10:00am
Start with;
FPE interior panel change out
After SECO disconnects;
Change out main breaker enclosure at meter.
352.552.2554
(after shop)