Loading Events

General Source – Dustin, Paul

Contract
Materials in shop
Rigid conduit on front apron by gate for OH riser

Building adjacent to existing service. Plan materials needed to tie in after green tag and energized. 3 phase loads fed from outside. 1 phase loads will remain and be fed from 3 phase feed thru lugs.
7:00am

Posted in

Rick Batchelor