Loading Events

Hauff – Aronoff Trim – Dustin

Contract
Finish everything
7:00am

Per Garett;

Living:
install missing receptacle

Kitchen:
install two gain cover plate
Install plug for warming drawer

Stairs:
Install three candle lights
Cover plate missing screw

Outside:
Exposed wires on back eve

There might be one or two other things feel like I’m forgetting something but I’ll be there tomorrow morning

And we need to do a hot check because some of the receptacles are not working

Posted in

Rick Batchelor