Loading Events

HBH – Lot 112 Trim – Justin G.

Contract
The master valve, flow sensor, controller and rain sensor are installed at 112.

It needs the electrician to come in and hard wire it.

(after you get Paul going at 75)

Posted in

Rick Batchelor