
- This event has passed.
HBH – Lot 112 Trim – Justin G.
October 28, 2021 @ 8:00 am - 9:00 am
Contract
The master valve, flow sensor, controller and rain sensor are installed at 112.
It needs the electrician to come in and hard wire it.
(after you get Paul going at 75)