- This event has passed.
HBH – Riverview Rough – Gerard
October 27 @ 7:00 am - 3:30 pm
Time and Materials
Materials in shop
Each House;
Add 12/2 septic circuit opposite side of house.
Add receptacle at AHU closet (will be marked out)
Flip low-voltage panels 180°
7:00am (job site)