
- This event has passed.
HBH – Sanford T Pole – Dustin
May 20 @ 1:00 pm - 3:30 pm
CONFIRM RETAINER KIT WORKS BEFORE LEAVING YARD
Contract
Materials on outgoing job shelf to install backfed main retainer, new PVC weatherhead
Add second ground rod to existing one driven, #4 bare cu sol with T Pole in yard by stairs. Make sure you have acorn clamps
Reuse existing bracing
Label panel
If a breaker remains in there not in use label it spare
(After Gegaj)