Loading Events

HBH – Volheim Lot 137/138 – Justin G., Gerard

Time and materials

Connect wiring for sub temporary, wires are ready to be tied in to the line side of the GFIs on the existing sub temporary.

Call Dustin if you have questions

7:00am

Posted in

Rick Batchelor