
Time and Materials
Repair meter (unsure what wrong, doesn’t feel right when you go to remove the meter)
We have SECO scheduled between 10-11:00am to shut power off.
Inspection scheduled for Tuesday afternoon with Lake County.
Meter main combo was in shop, should have grabbed this Monday afternoon.
10:00am
Posted in