Loading Events

Jennings Lot 302 Trim – Justin

Time and Materials

Remove light fixture, demo wire, junction box will be covered over. Adjust tow kick 16/2 stub out back so that it is under the cabinet a couple of inches.

(After you get Josh M. started at 298)

Posted in

Rick Batchelor