
Contract
Materials are at shop to build, dismantle a underground and make in to a overhead with 2″ PVC up the side and a 90 for SECO.
Staked to be set within 5′ of permanent service
(after Jennings)
Posted in

Contract
Materials are at shop to build, dismantle a underground and make in to a overhead with 2″ PVC up the side and a 90 for SECO.
Staked to be set within 5′ of permanent service
(after Jennings)