Loading Events

Marlin Pro – Longhofer T Pole – Justin G.

Contract

Materials are at shop to build, dismantle a underground and make in to a overhead with 2″ PVC up the side and a 90 for SECO.

Staked to be set within 5′ of permanent service

(after Jennings)

Posted in

Rick Batchelor