Loading Events

McGill Dock – Billy

Time and Materials

They decided not to router and trim with wood for the LV cable.

Sleeve low voltage cable in conduit using LBs top and bottom, make sure you have conduit and straps and LBs.

(after shop)

Posted in

Rick Batchelor