
- This event has passed.
Mike Spears Service Change – Dustin, Paul
January 12, 2021 @ 9:00 am - 11:00 am
Contract
Gate Code 2001 SEND
Service upgrade to 400 amp
Materials in shop by shelf near front man door and roll up door.
Remove 200 amp meter main combo and whatever that back fed looking recep is.
Install new 400 amp meter main combo, connect new 2″ PVC conduit feeding down to shop.
Suck string line in new conduit before disconnecting power so we can get a wire measurement.
Install new receptacle at service, intersystem bonding block, make sure there is a UFER ground or two ground rods
GET WITH STACI EARLY ON ANYTHING YOU DON’T HAVE BEFORE LEAVING SHOP AND GOING TO ZIMMERMAN.
(9:00am SECO scheduled to disconnect)