
- This event has passed.
Pinecrest Lakes Academy – Ben
November 16, 2022 @ 11:00 am - 1:00 pm
Contract
Materials in shop
Elevator Surge installation
3 devices
Cap neutral on 480v 3 phase per manufacturer, install with taps on elevator wires before they land on elevator terminals.
Cab light device 120v land on cab light circuit before they land on elevator terminals
Phone device splice right where they are jointed (open splice) and use wire nuts to secure the open splice
Jacqueline Reyes – Admin Assistant/HR
(352)223-4482
(After Wright Lakeview)