
- This event has passed.
Rick Scruggs – Dustin, Paul
November 16, 2020 @ 7:00 am - 3:30 pm
Contract
Service change, materials in shop with proposal
I believe there is a 200 amp meter can already in play. If it is in good shape and as long as it doesn’t say something like 100 or 150 amp rated, leave it. Replace the exterior panel, I think there is a circuit to reconnect outside off the new feed thru panel. Replace the SER cable and the interior panel. We are going to call the inspector first thing and ask him for a afternoon inspection.
SECO scheduled to disconnect at 9:00am
407.466.4429
7:00am