Loading Events

Riffle Service Change – Ryan, Josh M.

SECO scheduled to disconnect between 9-10:00am

Contract

Materials on site

Switching existing 200 amp meter main combo to 400 amp meter main combo with 2 – 150 amp MBs

Need to run 2″ conduit from new meter main combo, under the side walk out past the water line and the dock power conduit.

Mount the MB 8 circuit feed thru on the new residence and stub 2″ conduit toward existing house. Once they underground locate we can trench between the two.

9:00am

Posted in

Rick Batchelor