
- This event has passed.
Riffle Service Change – Ryan, Josh M.
June 30, 2021 @ 9:00 am - 1:00 pm
SECO scheduled to disconnect between 9-10:00am
Contract
Materials on site
Switching existing 200 amp meter main combo to 400 amp meter main combo with 2 – 150 amp MBs
Need to run 2″ conduit from new meter main combo, under the side walk out past the water line and the dock power conduit.
Mount the MB 8 circuit feed thru on the new residence and stub 2″ conduit toward existing house. Once they underground locate we can trench between the two.
9:00am