Contract
Trench by owner
Pick up materials from shop
Remaining materials delivered to job site
Wire measurement needed right away once 2 1/2″ conduit is turned up. While working on the 2″ conduit into the mobile home we will bring all of the wire. 250mcm x 2 and 1 -4/0 neutral and 1 – #2 ground going in 2 1/2″. 4/0 x 3 and 1 – #4 ground going in 2″. All aluminum