
- This event has passed.
Weber Spec 1 Well – Justin, Tanner
February 3, 2021 @ 10:00 am - 12:00 pm
Contract
Materials in shop
Run conduit for well, connect to T Pole
100′ – 3/4″ PVC conduit sch 40
10′ – 3/4″ PVC conduit sch 80
Vinyl post, cap, pullout disconnect
Pull wire long enough to extend from T Pole to permanent service later, leave curled up and buried at base of T Pole with a piece of plywood over it to protect it then bury it.
(after Bagwell)