Summit Greens – Back Gate Well – Dustin, Andre

FL, United States

Contract Change rotation by flipping B and C phase on line side of meter. Disconnect ahead of meter is hot, locked off by Duke. Call Neil when complete 407.216.9742. He will have them come out and set meter, we'll have to return on the way home to check rotation at pump. 7:00am