Adams – Services – Justin H.

FL, United States

Materials in shop and out in yard. 200 amp meter main combos, there is a box with fittings, bonding block and misc stuff for each job. (Don't take breakers or interior panels for any of them.) Need a down pipe 2" PVC sch 80 and a 1/2" PVC sch 80 for UFER for each. Need…