Adams – Merwine Trim – Logan, Justin

Adams - Merwine 1845 Griffin Ave., Lady Lake, Fl., FL, United States

Contract Change order paperwork in shop Hot check complete make sure everything works. Review change orders make sure everything is completed 7:00am

Adams – Merwine Trim – Logan, Justin L.

Adams - Merwine 1845 Griffin Ave., Lady Lake, Fl., FL, United States

Contract Missed items on change order Flood light junctions on 1 switch (we have video that shows two in back corners one wire each) 3 - 6” recess missed on front porch. Contract “still to do” Vanity Lights Paddle Fans (downrods are in) Time and Materials Well power 7:00am

Adams – Merwine Rough – Josh M.

Adams - Merwine 1845 Griffin Ave., Lady Lake, Fl., FL, United States

Contract Materials on site Wire in the shop (book and print with wire) 7:00am

Adams – Merwine Slab – Ryan, Tanner

Adams - Merwine 1845 Griffin Ave., Lady Lake, Fl., FL, United States

Contract Materials to be delivered to job site. Make sure you have duct tape, glue and plastic stakes along with the book and print. After Ahmed (as long as it is not raining)