Beacon Bay 818 S Palmetto
Beacon Bay – Brandon
Beacon Bay 818 S Palmetto 818 S. Palmetto Ave., Sanford, Fl., FL, United StatesTime and Materials Add GFI on balcony 1-3:00pm
Beacon Bay – Brandon
Beacon Bay 818 S Palmetto 818 S. Palmetto Ave., Sanford, Fl., FL, United StatesTime and Materials Add GFI on balcony 7-8:00am
Beacon Bay Palmetto – Brandon
Beacon Bay 818 S Palmetto 818 S. Palmetto Ave., Sanford, Fl., FL, United StatesContract converted closet into bathroom, bathroom receptacle circuit was supposed to be tied in to existing bath circuit. Lighting circuit tied in to existing circuit. failed inspection Label Panel, be sure and mark panel accordingly, show circuit lighting is on, show bathroom receptacle as being on a bathroom receptacle circuit. You should take some white…
Beacon Bay Palmetto – Derrek
Beacon Bay 818 S Palmetto 818 S. Palmetto Ave., Sanford, Fl., FL, United StatesContract Finish bath recep Time and Materials Fan/light combo 7:00am
Beacon Bay Palmetto – Derrek
Beacon Bay 818 S Palmetto 818 S. Palmetto Ave., Sanford, Fl., FL, United StatesContract Trim Materials in shop (after shop)
Beacon Bay 818 S, Palmetto – Chris N., Derrek
Beacon Bay 818 S Palmetto 818 S. Palmetto Ave., Sanford, Fl., FL, United StatesContract Staci may have book together and on her desk, I'm going to go by early in the morning and check to see, I forgot to look for it and put it out there in the warehouse. Materials in shop on floor by forklift. Rough in 7:00am If you finish with enough time left…